01Regression detected
A charge disappears inside a dense ledger
明细表丢失金额与唯一编号
One of 20 invoice lines loses its reference and $13,680 charge. Other rows, running totals and the three surrounding pages survive.
- Actual / baseline
- 4 / 4 pages
- Affected pages
- 1
- Differing pixels
- 229
Page 2: find the blank reference and amount. The required-text failure links to the baseline row.
Open comparison report ↗02Passed with a precise mask
A new date passes a precise mask
只更新时间,正确通过
The generation date changes inside the same text item as the approved total. The rest of the four-page packet stays identical.
- Actual / baseline
- 4 / 4 pages
- Affected pages
- 0
- Differing pixels
- 0
Page 1: enable mask bounds and use the overlay. The nearby $148,320 total remains visible and under test.
Open comparison report ↗03Regression detected
The masked date cannot hide a wrong total
日期遮罩不会放过相邻金额
The date changes again, but the total on that same line becomes $148,920. The exact same date rule must reject this export.
- Actual / baseline
- 4 / 4 pages
- Affected pages
- 1
- Differing pixels
- 15
Page 1: compare the unmasked amount, then switch to Difference to locate the changed digits.
Open comparison report ↗04Regression detected
A font change pushes the report to five pages
字体、行高和分页发生连锁变化
Invoice rows use a wider serif font and taller spacing. The ledger spills onto a new page, shifting the bilingual appendix and landscape schedule.
- Actual / baseline
- 5 / 4 pages
- Affected pages
- 5
- Differing pixels
- 1,301,167
Start on page 2, then inspect pages 3–5. Original sizes are preserved and the last page is reported as added.
Open comparison report ↗05Regression detected
The landscape handover page is lost
横向交付计划整页丢失
The executive summary, invoice ledger and bilingual appendix remain identical. The final schedule and KPI acceptance table disappear.
- Actual / baseline
- 3 / 4 pages
- Affected pages
- 1
- Differing pixels
- 1,090,584
Page 4: the baseline schedule is present; the actual side clearly says the page is missing.
Open comparison report ↗